SW Georgia Bridge and Road Maintenance Contracts Awarded

Staff Report From Tifton CEO

Thursday, November 1st, 2018

Important maintenance of Southwest Georgia bridges and roads continues with the award earlier this month of $8.5 million in construction contracts.

A $2 million contract was awarded to Seminole Equipment Inc. to replace joints and paint bridges at SR 37 over the Chattahoochee River in Clay County and SR 309 over US 84/US 27/SR 1 in Decatur County. Other locations are in Dougherty County: US 82/SR 520 east over Palmyra Road; US 82/SR 520 east and west over US 82 Bus/US 19 Bus/SR 520 Bus; SR 520 east and west over the Flint River; US 19/SR 520 south over East Broad Avenue and Blaylock Street over SR 520. Maintenance helps preserve and extend the life of a bridge. The completion date is July 31, 2019.

Approximately 27 miles of state route resurfacing will also be done. Those contracts are: SR 35 from the Tift County line to south of SR 32 in Irwin County, awarded to Reeves Construction Co.; SR 27 from north of SR 50 in Quitman County to the Stewart County line, awarded to Oxford Construction Co.; and SR 3 Alt from south of Pine Street to south of SR 111 in Thomas County, awarded to The Scruggs Co. The three contracts have a completion date of Aug. 31, 2019. Georgia Department of Transportation contracts are awarded to the lowest qualified bidder.